A concrete mid-rise building under construction with a tower crane above it
Lintel

Every open item,pinned to the building.

Punch lists, schedules, RFIs and daily logs for general contractors, each one tied to the floor it's about.

Punch list18open

1Guardrail gap at the slab edge

Level 11, eastConcreteDue today

Daily logWed, Nov 11

Weather
54°F, clear, wind 8 mph
On site
23 workers, 4 trades
Inspection
Framing L3, passed

Filed by Ana Ruiz, superintendent, at 4:42 PM

Schedule

Hang drywall, level 3

Held two days by the framing inspection. Three tasks move with it.

See the schedule

Hold one task.Watch what moves.

A three-week lookahead your trades can read. Push the drywall back and every task that waits on it slides with it.

Drag the orange bar to hold the drywall.

Week of Nov 16MTWTF
Week of Nov 23MTWTF
Week of Nov 30MTWTF
  • Framing inspection, L3Inspector

    1d
  • Roof membraneRoofing

    4d
  • Hang drywall, L3Drywall

    4d
  • Tape and finish, L3Drywall

    3d
  • Elevator inspectionInspector

    1d
  • Prime and paint, L3Paint

    3d
  • Cabinets, L3Millwork

    2d

On plan. Cabinets, L3 ends Wed, Dec 2.

Ask the architecton the drawing itself.

Questions go out pinned to the sheet they're about, and the answer comes back on the revised drawing.

ABCUNIT 4BCORRIDOR32'-0"RFI 027A-401 · L4 PLAN

RFI 027

Door 4B-02 swings into the corridor

Answered · in 2 days

  1. Ana Ruiz SuperintendentMon, 8:14 AM

    Door 4B-02 swings into the corridor and blocks the path to the stair. Can we flip it to swing into the unit?

  2. Dana Kline Architect, Studio KlineTue, 3:40 PM

    Yes. Flip the swing into the unit and keep the closer. Revised on A-401, issued as ASI 4.

  3. Ana Ruiz SuperintendentWed, 9:02 AM

    Framers have the revision. Closing the RFI.

From the field,straight to the office.

Your superintendent posts from the site in a few taps. The office sees who's on site, by trade, as it happens.

A superintendent in a white hard hat checking a phone on site

ARAna RuizSuperintendent, Ridgeline Builders

Next update

Electrical · 57:20 AM

Rough-in on L4 east, units 4A to 4D.

On site today8workers

  • Drywall8
  1. Drywall · 87:02 AM

    240 sheets delivered and staged on L3.

One price per job.Everyone on it is free.

Pay for the projects you're running this month. Your whole team and every subcontractor log in at no charge.

Active projects3× $249$747
Unlimited users
$0
Subcontractor logins
$0
Photo and drawing storage
$0
Onboarding call with your team
$0

Total$747a month

Start a 30-day trial
Tower cranes over a large building site

Ten or more jobs?

One yearly price for your whole portfolio, single sign-on, and a project manager from our team for your first 90 days.

Talk to sales

Questionsfrom the trailer.

What superintendents and project managers ask before they switch.

Do subcontractors pay to use it?

No. Subs get their own login on every job you add them to, free. They see their items, their schedule and their RFIs, and nothing else.